- Posts: 2
- Thank you received: 0
Can't change order status.
10 years 6 months ago #239093
by hellohx
Can't change order status. was created by hellohx
Hi,
I doing a bank transfer method but may i know why I can’t change the order status on the joomla back end? It is showing this pop out message “{address_company} {address_title} {address_firstname} {address_lastname} {address_street} {address_post_code} {address_city} {address_state} {address_country} Telephone: {address_telephone}”
Is it updating to the latest version of the hikashop can solve this problem?
Thanks.
I doing a bank transfer method but may i know why I can’t change the order status on the joomla back end? It is showing this pop out message “{address_company} {address_title} {address_firstname} {address_lastname} {address_street} {address_post_code} {address_city} {address_state} {address_country} Telephone: {address_telephone}”
Is it updating to the latest version of the hikashop can solve this problem?
Thanks.
Please Log in or Create an account to join the conversation.
10 years 6 months ago #239120
by nicolas
Replied by nicolas on topic Can't change order status.
Hi,
It's a bug of the popup system of Joomla in new versions.
Make sure that you're using the latest version of HikaShop and that you have the "popup mode" setting of the HikaShop configuration set to "vex" and you won't have the problem.
It's a bug of the popup system of Joomla in new versions.
Make sure that you're using the latest version of HikaShop and that you have the "popup mode" setting of the HikaShop configuration set to "vex" and you won't have the problem.
The following user(s) said Thank You: hellohx
Please Log in or Create an account to join the conversation.
10 years 6 months ago #239209
by hellohx
Replied by hellohx on topic Can't change order status.
Hi Nicolas,
Thanks for your reply.
But I have problem updating the latest Hikashop now.
I'm trying to upload the latest version but it has this error message.
There was an error uploading this file to the server.
Maximum PHP file upload size is too small: This is set in php.ini in both upload_max_filesize and post_max_size settings of your PHP settings (located in php.ini and/or .htaccess file)
Please advise.
Thanks for your reply.
But I have problem updating the latest Hikashop now.
I'm trying to upload the latest version but it has this error message.
There was an error uploading this file to the server.
Maximum PHP file upload size is too small: This is set in php.ini in both upload_max_filesize and post_max_size settings of your PHP settings (located in php.ini and/or .htaccess file)
Please advise.
Please Log in or Create an account to join the conversation.
10 years 6 months ago #239220
by nicolas
Replied by nicolas on topic Can't change order status.
Hi,
Well, as the message says, you need to increase the upload_max_filesize and/or the post_max_size settings of your PHP settings.
If you don't know how, you can ask your hosting company.
Alternatively, you can do an install via FTP and it will circumvent the problem:
www.hikashop.com/support/documentation/5...-to-install.html#ftp
Well, as the message says, you need to increase the upload_max_filesize and/or the post_max_size settings of your PHP settings.
If you don't know how, you can ask your hosting company.
Alternatively, you can do an install via FTP and it will circumvent the problem:
www.hikashop.com/support/documentation/5...-to-install.html#ftp
Please Log in or Create an account to join the conversation.
Time to create page: 0.058 seconds