- Posts: 9
- Thank you received: 0
Change order number
9 years 5 months ago #270491
by sriva
Change order number was created by sriva
-- HikaShop version -- : 3.10
-- Joomla version -- : 3.72
-- PHP version -- : 5.63
-- Browser(s) name and version -- : all
-- Error-message(debug-mod must be tuned on) -- : None
Hi,
How can I change the Order Number?
This {id size="5"} doe not work. I replaced the "automatic_code " with this string The result is the same (id size="5").
How can I change it? What is the right syntax?
-- Joomla version -- : 3.72
-- PHP version -- : 5.63
-- Browser(s) name and version -- : all
-- Error-message(debug-mod must be tuned on) -- : None
Hi,
How can I change the Order Number?
This {id size="5"} doe not work. I replaced the "automatic_code " with this string The result is the same (id size="5").
How can I change it? What is the right syntax?
Please Log in or Create an account to join the conversation.
9 years 5 months ago #270492
by nicolas
Replied by nicolas on topic Change order number
Hi,
If you were using {id size="5"} it would work. However, on your screenshot, there is a space before the =, after the =, and the double quotes are not the standard double quote characters but some other character of UTF-8.
If you use exactly {id size="5"}, you'll see that it will work.
If you were using {id size="5"} it would work. However, on your screenshot, there is a space before the =, after the =, and the double quotes are not the standard double quote characters but some other character of UTF-8.
If you use exactly {id size="5"}, you'll see that it will work.
Please Log in or Create an account to join the conversation.
9 years 5 months ago #271255
by sriva
Replied by sriva on topic Change order number
Hi,
that worked. Maybe you could change the code in the manual to a code which could be copied, or add the information to have no blanks in the code.
thx
Stefan
that worked. Maybe you could change the code in the manual to a code which could be copied, or add the information to have no blanks in the code.
thx
Stefan
Please Log in or Create an account to join the conversation.
Time to create page: 0.059 seconds