Can't change order status.

  • Posts: 2
  • Thank you received: 0
10 years 3 months ago #239093

Hi,

I doing a bank transfer method but may i know why I can’t change the order status on the joomla back end? It is showing this pop out message “{address_company} {address_title} {address_firstname} {address_lastname} {address_street} {address_post_code} {address_city} {address_state} {address_country} Telephone: {address_telephone}”

Is it updating to the latest version of the hikashop can solve this problem?

Thanks.

Attachments:

Please Log in or Create an account to join the conversation.

  • Posts: 86080
  • Thank you received: 14186
  • MODERATOR
10 years 3 months ago #239120

Hi,

It's a bug of the popup system of Joomla in new versions.
Make sure that you're using the latest version of HikaShop and that you have the "popup mode" setting of the HikaShop configuration set to "vex" and you won't have the problem.

The following user(s) said Thank You: hellohx

Please Log in or Create an account to join the conversation.

  • Posts: 2
  • Thank you received: 0
10 years 3 months ago #239209

Hi Nicolas,

Thanks for your reply.
But I have problem updating the latest Hikashop now.
I'm trying to upload the latest version but it has this error message.

There was an error uploading this file to the server.
Maximum PHP file upload size is too small: This is set in php.ini in both upload_max_filesize and post_max_size settings of your PHP settings (located in php.ini and/or .htaccess file)


Please advise.

Attachments:

Please Log in or Create an account to join the conversation.

  • Posts: 86080
  • Thank you received: 14186
  • MODERATOR
10 years 3 months ago #239220

Hi,

Well, as the message says, you need to increase the upload_max_filesize and/or the post_max_size settings of your PHP settings.
If you don't know how, you can ask your hosting company.
Alternatively, you can do an install via FTP and it will circumvent the problem:
www.hikashop.com/support/documentation/5...-to-install.html#ftp

Please Log in or Create an account to join the conversation.

Time to create page: 0.054 seconds
Powered by Kunena Forum