Change order number

  • Posts: 9
  • Thank you received: 0
9 years 2 months ago #270491

-- HikaShop version -- : 3.10
-- Joomla version -- : 3.72
-- PHP version -- : 5.63
-- Browser(s) name and version -- : all
-- Error-message(debug-mod must be tuned on) -- : None

Hi,
How can I change the Order Number?
This {id size="5"} doe not work. I replaced the "automatic_code " with this string The result is the same (id size="5").
How can I change it? What is the right syntax?

Attachments:

Please Log in or Create an account to join the conversation.

  • Posts: 86080
  • Thank you received: 14186
  • MODERATOR
9 years 2 months ago #270492

Hi,

If you were using {id size="5"} it would work. However, on your screenshot, there is a space before the =, after the =, and the double quotes are not the standard double quote characters but some other character of UTF-8.
If you use exactly {id size="5"}, you'll see that it will work.

Please Log in or Create an account to join the conversation.

  • Posts: 9
  • Thank you received: 0
9 years 2 months ago #271255

Hi,

that worked. Maybe you could change the code in the manual to a code which could be copied, or add the information to have no blanks in the code.

thx

Stefan

Please Log in or Create an account to join the conversation.

Time to create page: 0.057 seconds
Powered by Kunena Forum